论文部分内容阅读
我段处于沁河南岸,黄河北岸,黄沁相匯的三角地帶,交通不便,險工又多。全段共有險工13处,長达27华里又300公尺,有新旧壩垜167个單位,在解放后才改用石料工程。由于沁河河道接近山区,坡降很陡,洪猛湍急,河势善变,这不但造成每年搶險任务很大,也使各項修防工作处于被动局面。为改变这种
I paragraph is located in the south bank of the Qinhe River, the Yellow River north bank, Huang Qin phase of the Triangle, the traffic inconvenience, dangerous and more. A total of 13 workers in the whole section, as long as 27 and 300 meters, with 167 units of new and old dam, only after the liberation of stone projects. Due to the close proximity of the Qinhe River to the mountainous areas, the steep slopes are steep and the floods and rages are swift and the rivers are fickle. This not only results in a great rescue mission each year, but also makes the various repair and repair work in a passive situation. To change this