论文部分内容阅读
设计洪水复核,对水电站工程的防洪安全及除险加固规模的确定尤为重要。通过石灰厂水文站(1953~2012年)的资料系列,对永福水电站设计洪水进行了详细地分析计算和全面复核。本次洪水复核计算为永福水电站设计防洪标准选择和除险加固防洪度汛工程实施等提供了科学的数据依据。
Design flood review, the flood control project of hydropower project and determine the scale of reinforcement is particularly important. Through the data series of limestone hydrological station (from 1953 to 2012), the design flood of Yongfu Hydropower Station was analyzed and calculated in detail and comprehensively reviewed. This flood check calculation provides the scientific data basis for the selection of flood control standards for Yongfu Hydropower Station and the implementation of Flood Prevention and Floodproofing Project for reinforcement and flood prevention.