论文部分内容阅读
日前,水电水利规划设计总院在京组织召开《水电技术标准“走出去”研究成果报告——工程测量与地质勘察》(以下简称《报告》)编制大纲、附件中的案例研究报告和中外标准对照研究报告讨论会。中国电建北京院、西北院、华东院、中南院、昆明院、贵阳院等单位,以及成都院地质、勘察、试验、物探等相关专业专家参会。《报告》为国家能源局委托规划总院牵头开展的科技项目《水电技术标准“走出去”研究》之A02工程测量与地质勘察。本专题依托电建集团已开展的海外工程,通过国外水电工程测量与地质勘察技术标准应用研究、工程测量与地质勘察中外技
Recently, the General Administration of Hydropower, Water Resources Planning and Design organized a “Outline for Compilation of Hydropower Standards” Going Out, “Report on Research Results - Engineering Survey and Geological Prospecting” (hereinafter referred to as the “Report”) and the case studies in the annex Standard Control Study Report Symposium. China National Electric Building, Beijing Hospital, Northwest Hospital, East China Hospital, Central South Hospital, Kunming Hospital, Guiyang Hospital and other units, as well as Chengdu Institute of geology, prospecting, testing, geophysical and other related professional experts participating. The “Report” is A02 Engineering Survey and Geological Prospecting, which is the science and technology project “Hydropower Technical Standard” Going Out “Research” which is entrusted by the National Planning Bureau of Planning. This project relies on the overseas construction projects already carried out by the Electric Construction Group. Through the application and research of the technical standards for surveying and geological surveying of hydropower projects in other countries, the project of surveying and geotechnical surveying in China and foreign countries