一、梯级电站概况以礼河发电厂共有四个梯级电站。先后于1958年至1971年建成。总容量为32.15万千瓦。以礼河是金沙江的一条小支流,全长122公里,总落差约为1500米,电站采用跨流域开发。一级毛家村水库总库容达5.5亿m~3,电站装有二台容量为8000千瓦斜流式水轮机组。二级水槽子有一个周调节水库,总库容是958万m~3。电站装有二台容量为8750千瓦的法兰西斯式机组。三级建于盐水沟旁,四级位于金沙江的另一支流小江之滨,二者水头相近,采用隧洞和压力钢管过水,各装有四台容量为36000千瓦的捷制冲击式水轮机组。
First, the cascade plant Overview Lihe power plant a total of four cascade power plants. It was built in 1958-1971. The total capacity of 321,500 kilowatts. Eli River is a small tributary of the Jinsha River, a total length of 122 km, the total drop of about 1,500 meters, the use of inter-basin power station development. A Maojiacun reservoir total storage capacity of 550 million m ~ 3, power station equipped with two capacity of 8,000 kilowatts oblique flow turbine. Secondary water tank has a weekly regulation of the reservoir, the total storage capacity is 9.58 million m ~ 3. The station is equipped with two Francis turbines with a capacity of 8750 kW. Three were built next to the salt water ditch, four on the other side of the Jinsha River tributary of the small river, the two heads are similar, the use of tunnels and pressure pipe through the water, each with four 36,000-kilowatt capacity of Czech-made impact turbine .