论文部分内容阅读
上海局管内京九线位于安徽省西北部,自1996年开通运营以来,取得了良好的经济效益和社会效应。随着我国改革开放的不断深入,运输市场竞争空前激烈,提速扩能成为铁路部门的要务。围绕部、局“十五”规划和铁路跨越式发展战略,适应重载快速要求,上海局京九线管内全线铺设P60跨区间无缝线路,强化轨道结构,改善线路设备,适应铁路全面大提速。
Shanghai Municipal Administration Bureau of the Beijing-Kowloon Line is located in the northwestern Anhui Province, since 1996 opened up operations, and achieved good economic and social effects. With the continuous deepening of China’s reform and opening up and unprecedented competition in the transportation market, speeding up and expansion of the railway sector has become the most important task for the railway sector. Surrounding the Ministry, “Tenth Five-Year” plan and the railway leapfrog development strategy to meet the rapid heavy load requirements, Shanghai PAB Intercoil line seamless pipe laying across the P60, strengthen the track structure, improve the line equipment to adapt to the railway large and large Speed up.