水电站尾水渠指的是尾水从发电站厂房排泄到下游河床的渠道。经过水轮机后,水流所携带的水能为水轮机吸收利用,成为尾水。尾水渠是水电站重要的组成部分,关系到水电站运转的流畅性。因水流原因,尾水渠的施工往往采用吊模的方式进行施工。因为水电站施工的特殊性,吊模施工技术对尾水渠的质量具有决定性的影响。所以本文对吊模施工技术进行了探讨,以提高尾水渠的施工质量。
The tailrace of a hydropower station refers to the channel through which the tail water is drained from the power plant to the downstream riverbed. After the turbine, the water carried by the water can be absorbed by the turbine to become a tail water. Tail canal is an important part of hydropower station, relates to the smooth operation of hydropower station. Due to water flow, the construction of tailrace is often carried out by hanging mode. Because of the particularity of construction of hydropower station, the technology of hanging mold construction has a decisive influence on the quality of tailrace. Therefore, this article discusses the hanging mold construction technology to improve the construction quality of the tailrace.