论文部分内容阅读
中国原子能科学研究院现有两座放射性废物暂存库,其中一座废物库已装满废物停运封存,另一个废物库也即将装满废物等待处理。这些废物库均已超期服役。为此,我院需建成一套放射性固体废物回取、分拣、预压实、分类检测专用设备,为院现有固体废物的回取与整备及今后新产生固体废物的处理提供工程应用装置,并为核工业固体废物处理提供示范。工程包括:废物库
At present, China Institute of Atomic Energy has two temporary radioactive waste repositories. One of the waste repositories is full of wastes for storage and storage. The other one is about to be filled with wastes to be disposed of. These waste banks have been extended service. To this end, our hospital needs to build a set of special equipment for the retrieval, sorting, pre-compaction and classification of radioactive solid waste, provide engineering application devices for the recovery and preparation of the existing solid waste and the treatment of newly generated solid waste in the future , And provide a demonstration of solid waste disposal in the nuclear industry. The project includes: Waste storage