1 概述信钢现有4座高炉、冲渣水处理一直沿用侧滤工艺。其中1号、2号高炉水力冲渣系统在1994年进行了改造,现将改造时有关的工艺设计作以介绍。2有关技术参数的确定两座120m3高炉日产渣量240t,出渣次数为24次/日,每次渣量10t,冲渣比为1:1(),冲渣用水量100t/次,每次冲渣历时15n、in,冲渣所需的水量为
1 Overview Sinosteel has four blast furnaces, slag water treatment has been followed by side filtration process. One of No. 1, No. 2 blast furnace hydraulic slag system was rebuilt in 1994, the process is to transform the design for the introduction. 2 to determine the technical parameters of two 120m3 blast furnace daily output of 240t, the number of slag was 24 times / day, each slag volume 10t, slag ratio of 1: 1 (), slag water consumption 100t / time, each time Dumping lasted 15n, in, the amount of water required for dregs was