论文部分内容阅读
由我院设计,交通部第一公路工程局施工的辽宁双台子河曙光大桥已于1979年11月胜利建成。这座桥全长500多米,由跨径45米的预应力混凝土简支梁及跨径20米的钢筋混凝土简支梁组成,此外,两岸连接桥台处各有一孔跨径8米的钢筋混凝土板。东西两岸桥台,为了抵抗台桂承受的强大填土水平侧压力,我院在以前学习和采用锚定板结构经验的基础上,大胆的将它引用到本桥的桩桂埋置式桥台上,构成锚定板式桩柱埋置式桥台。我们知道,一般的锚定板挡土结构由钢筋混凝土面墙、钢拉杆和锚定板三种构件
The Shuangtaizi River Dawn Bridge constructed by our institute and constructed by the First Highway Engineering Bureau under the Ministry of Communications was successfully completed in November 1979. The bridge is more than 500 meters in length and consists of a prestressed concrete beam with a span of 45 meters and a reinforced concrete beam with a span of 20 meters. In addition, reinforced concrete board. In order to resist the strong horizontal pressure on the fill level of Taiwan-Gui, our hospital, based on the previous experience in studying and adopting the structure of anchoring plates, dared to refer it to the pile-bridge buried bridge abutment of this bridge , Constitute the anchor plate pile embankment abutment. We know that the general anchoring plate retaining structure consists of three components of reinforced concrete wall, steel rod and anchor plate