论文部分内容阅读
铸造冷却台用于钢锭脱模和冷却,工作时不但承受静载,还承受冲击载荷。冷却台装焊后,若存在较大的焊接变形,将使联系焊缝变为工作焊缝。由于冷却台结构庞大,矫正焊接变形将非常困难。1冷却台的结构及主要技术要求冷却台由6根纵梁和2根横梁构成,长3.6m,宽1.95m、厚200mm
Casting cooling table for strip demoulding and cooling, work not only to withstand static load, but also to withstand the impact load. Cooling station installed welding, if there is a larger welding deformation, will contact the weld into a working weld. Due to the large cooling tower structure, correcting welding deformation will be very difficult. 1 cooling tower structure and the main technical requirements Cooling table consists of 6 beams and two beams, length 3.6m, width 1.95m, thickness 200mm