提升装置SV1号盲副井内装有4套提升装置,其中两套为临时性的用于凿井施工。吊盘绞车在井筒开始往500m 水平以下掘进之前,吊盘绞车安装在430m 水平,用于操作凿井吊盘,然后用于操作安装吊盘。装备完毕之后,吊盘绞车便拆出。这套双滚筒液压绞车是从英国 M.B.Wild 公司购买的。滚筒直径1.8m,传动功率75kW,容绳量为2200m 直径35mm 的密封捻丝式钢绳,可缠绕7层。液压传动装置可使吊盘的变速范围达到5m/min。钢绳均从滚筒外层引出,绕过430m 水
Raise Device No. SV1 blind auxiliary shaft equipped with 4 sets of lifting devices, of which two for the temporary construction for drilling. Winch winch The winch winch was installed at a level of 430 m before the wellbore began to be driven below 500 m. The winch was used to operate a sink well, which was then used to operate a mounting hanger. After the equipment is completed, the winch winch will be removed. The twin drum hydraulic winch was purchased from the British company M.B.Wild. Drum diameter of 1.8m, transmission power of 75kW, capacity of 2200m diameter of 35mm sealed silk rope twist rope, can be wound 7 layers. Hydraulic transmission allows the variable speed range of the pallet up to 5m / min. Steel rope leads from the outer layer of the drum, bypassing 430m of water