Z-17B型无钢丝绳装岩机试制小结

来源 :矿山机械 | 被引量 : 0次 | 上传用户:Linuxy
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
1977年以来,我们了解到有些矿山将Z—17型装岩机进行了改进,取消了稳定铲斗架的四条钢丝绳,改用销子定位,这样改后虽然还存在一些问题,但总的来看是个方向。我厂从1979年开始研制无钢丝绳装岩机,1980年10月试制了两台无钢丝绳装岩机,分别在广西、湖南试用半年多表明机器修改设计是成功的,近半年来(81年),我们又生产了20台继续使用,反映较好。 Since 1977, we have learned that some mines have improved the Z-17 rock loader and canceled the four wire ropes that stabilize the bucket frame, instead using pin positioning. After this change, although there are still some problems, in general, See is a direction. Since 1979, our factory has developed a wire rope-free rock loader. In October 1980, two wire rope-free rock loader machines were trial-produced in Guangxi and Hunan provinces. The trial of more than six months in Guangxi and Hunan showed that the machine modification design was successful. In the past half year (81 years) , We have produced 20 units continue to use, reflect better.
其他文献
下面引入计算的例子以说明确定所列各个因素对成本的影响。1、产煤量的变化在生产费用中,与产煤量不直接有关的劳动和材料费(固定费用)占很大比重。这些费用的数值,应对每个
我矿两个一百多米深的主要提升作业井中,原用钢丝绳罐道的2号单层罐,采用无动力摇台踏压式联动的罐内阻车,由于矿石含硫量高,使阻车部分联锁连杆、弹簧等易受腐蚀,不但维修
B.选煤厂工人的劳动生产率对于选煤厂完成劳动生产率计划的分析顺序,基本上同对矿井的分析顺序(见表26)相类似。在因素分析的基础上查明劳动生产率偏离计划水平的原因,并作
新华网再次调整主页布局,重新编排内容分区和部分栏目结构,以更好地适应网民快速访问和方便浏览的需要。调整后的网页更加简洁、大方、流畅,内容更丰富,服务更便捷。 本次主
随着职业教育与企业合作不断深化,企业文化对职业院校的影响日益广泛和深刻。企业文化对职业院校培养学生职业素养具有特殊作用。职业院校应积极推动校园文化与企业文化对接,
英语单词一直是学生在英语学习中最大的难题。成千上万的英语单词如果不掌握一定的隐性规律,单纯靠机械记忆单词,将使英语学习事倍功半。为此,本文将英语单词的词形与其普遍
目前国内高职院校研究此类方面的课题并不多见,是因为高职院校不具备独立创作、执行整台剧目,无论从学校的人力、物力、财力等各方面无法到达外,也没有高素质的专业创作团队
阿巴坎矿床的上部用露天方法开采,下部用地下方法开采,竖井和阶段石门开拓。矿床第一阶段的开拓,用标高为+585米平峒进行。至+345米水平,矿床开采的阶段高度为80米,紧接下面
《浮选过程的物理化学基础》《浮选过程的物理化学基础》一书,是苏联编撰的,《矿产》出版社1980年出版。该书讨论了物理化学及与它相邻的固体物理、化学、结晶化学、地球化
大框框与小框框有一个故事:一歌星要在某市举办演唱会,该市某报派出一名记者去采访,不料记者空手而归,领导问其原因,他抱怨道:“那名歌星被人谋杀,演唱会被迫取消。”领导一