一、工程概况太岚线河下锚定板挡土墙位于古东站太原端牵出线上,与正线并行,在半径500米的曲线外侧。路堤总高22米。由于路堤紧靠太原市古交化肥厂,为使边坡填土不侵入该厂区,在路堤上部采用锚定板挡士墙(见示意图1及照片)。
First, the project profile Tai Lan line anchorage plate retaining wall is located in the ancient East Station Taiyuan pull line, parallel with the main line, in the radius of 500 meters outside the curve. The embankment total height of 22 meters. Since the embankment is close to the Gujiao Chemical Fertilizer Plant in Taiyuan, in order to ensure that the slope fill does not intrude into the plant, an anchoring plate retaining wall is used in the upper part of the embankment (see Diagram 1 and photos).