论文部分内容阅读
为了研究金布巴粉矿在烧结矿中的最佳配比,陕钢集团汉中钢铁有限责任公司(简称陕钢集团汉钢公司)与必和必拓公司长期合作,将必和必拓公司生产的金布巴粉矿在其2×265m~2烧结机上进行实践性生产。结果表明,通过采取低碳厚料烧结技术、调整水分控制标准、适当压料等措施,金布巴粉配比已达到30%,烧结矿成分、质量均能满足该公司烧结矿冶金性能和生产技术要求,为合理系统配矿、有效组织烧结工序生产提供了更好的条件。
In order to study the optimal ratio of the gold cloth in the sinter mine, Shaanxi Iron and Steel Group Hanzhong Iron and Steel Co., Ltd. (Han Steel Company of the Shaanxi Iron and Steel Group) and BHP Billiton company’s long-term cooperation will BHP Billiton Company’s production of gold Bomba powder In its 2 × 265m ~ 2 sintering machine for practical production. The results show that by adopting the low carbon thick material sintering technology, adjusting the water control standard and properly pressing the material, the ratio of the gold broom powder has reached 30%, the sinter ore composition and quality can meet the company’s sinter metallurgy performance and production Technical requirements for the rational system with ore, sintering process effectively organize the production provided better conditions.