为了又快又好地建设龙滩水电工程,实现建设“精品龙滩、绿色龙滩、和谐龙滩”的目标,龙滩水电开发有限公司(以下简称龙滩公司)在工程项目档案管理中实行“九列入”、“六参加”、“六同步”、“三审”、“一金”的“96631”项目档案管理的创新,有效解决了工程项目档案管理中的组卷、归档不及时、不完整、不准确以及归档率不高等实际问题,防止和减少了建设档案组卷的出错率和返工率,保证了项目档案的完整性、准确性、系统性。
In order to build Longtan Hydropower Project quickly and well and realize the goal of building Longtan, Green Longtan and Harmonious Longtan, Longtan Hydropower Development Co., Ltd. (hereinafter referred to as Longtan Company) In the implementation of the “nine included”, “six to participate in”, “six synchronization ”, “third trial ”, “one gold ” “96631 ” project file management innovation, effective Solve the project file management of the test paper, the file is not timely, incomplete, inaccurate and archiving the actual problem is not high, to prevent and reduce the construction archives volume error rate and rework rate to ensure the integrity of the project file , Accuracy, systematicness