道路混凝土的施工要求各工序工种平行流水,相互交错,施工机械、工具、劳力必须密切配合,工程使用的材料,品种多数量大,要求严,必须进行科学管理;道路施工现场分布面广、作业线长、条件差,必须有严密的施工组织计划,施工前应作好充分的准备,保证工程的进展和质量。1、施工前准备1.1工程计划:按设计文件要求,结合施工条件,确定施工方案,编制施工组织设计,其内容包括:施工的全面安
The construction of road concrete requires that all working procedures should be parallel with each other and staggered. Construction machinery, tools and labor must be closely coordinated. The materials and varieties used in the project are large in quantity and strict in requirements and must be scientifically managed. The road construction site is widely distributed and works Line length, poor conditions, there must be strict construction organization plan, construction should be fully prepared to ensure the progress and quality of the project. 1, Preparation before construction 1.1 Project plan: According to the requirements of design documents, combined with the construction conditions, determine the construction plan, the preparation of construction design, which includes: Construction of a comprehensive safety