王甫洲水电站机组选择设计过程历时较长,曾进行过多种方案比选工作。1987年以来,重点研究了进口机组方案,对水轮机型式、台数以及主要参数进行了充分的论证。在国外4家厂商提供的机组方案的基础上,确定了机组主要参数,最终选定了4台灯泡贯流式机组方案。机组从奥地利引进,为目前世界先进水平。以下重点论述了机组的选择设计过程,最后简要介绍了机组的结构特点。
Wangfuzhou hydropower plant selection design process lasted longer, has conducted a variety of programs than the election. Since 1987, the emphasis has been put on the scheme of imported units, and fully demonstrated the types of turbines, the number of units and the main parameters. On the basis of the unit plans provided by the four foreign companies, the main parameters of the unit were confirmed, and finally the program of 4 bulb-through units was finally selected. The unit imported from Austria, is currently the world’s advanced level. The following focuses on the selection of the unit design process, and finally briefed on the structural characteristics of the unit.