背景资料大朝山水电站位于云南省云县、景东县交界处,是澜沧江中游河段漫湾水电站下游的一个大型水电站。坝址距昆明630千米,装机总容量135万千瓦(6×22.5万千瓦),工程总投资88.7亿元。大朝山水电站第一台机组于2001年12月投入商业运行,2003年10月16日,全部机组建成投产。1991?
Background Data Dachaoshan Hydropower Station is located at the junction of Yunxian County and Jingdong County in Yunnan Province. It is a large-scale hydropower station downstream of Manwan Hydropower Station in the middle reach of the Minjiang River. The site of the dam is 630 kilometers from Kunming, with a total installed capacity of 1.35 million kilowatts (6 x 225,000 kilowatts) and a total investment of 8.87 billion yuan. The first unit of Dachaoshan Hydropower Station was put into commercial operation in December 2001. On October 16, 2003, all the units were completed and put into production. 1991?