论文部分内容阅读
即将开放的巴西水电市场和经常使用小水电的私营电力公司的最新运行经验表明有必要为小水电制定具体的规划设计程序。本文探讨了有关小水电最优化设计的规划和工程步骤,并根据装机容量和内含技术对之提出了一个新的分类法。
The recent operational experience of the upcoming Brazilian hydropower market and the privately owned power companies that regularly use SHP suggest the need to develop specific planning and design procedures for SHP. This article explores planning and engineering steps for the optimal design of small hydropower, and proposes a new taxonomy based on installed capacity and built-in technologies.