介绍高速铁路工程施工中已用于运输混凝土预制梁的900t运梁车的主要结构,论述运梁车悬挂系统的分组方法及各悬挂的受力情况。由于运输混凝土预制梁时,运梁车的受力情况比较恶劣,因此运梁车在设计过程中注意了几个问题:在液压系统中,将32个悬挂液压缸分为4组,每组8个,在每组悬挂中,其液压系统是相通的,因此其受力相同;起吊混凝土预制梁时,4点起吊,3点平衡;利用单芯防爆阀和双芯防爆阀确保了运梁车的安全性。给出了运梁车的整体悬挂图及单组悬挂系统图。
This paper introduces the main structure of 900t girder car which has been used to transport concrete prefabricated girder during the construction of high speed railway, and discusses how to group the girder girder suspension system and the suspension force. As the transport of concrete beam prefabricated beam, the beam of the beam is worse, so the beam beam in the design process, pay attention to several issues: In the hydraulic system, the 32 suspension cylinders are divided into four groups of 8 In each set of suspension, the hydraulic system is the same, so the same force; lifting concrete prefabricated beam, lifting 4:00, 3:00 balance; the use of single-core explosion-proof valve and dual-core explosion-proof valve to ensure that the girder Security. The overall suspension diagram and the single suspension system diagram are given.