湿接头钻具传输水平井测井施工工艺在国内日臻成熟,在长庆油田只气井区块每年有愈百口的施工任务。虽然湿接头钻具传输水平井测井施工流程简单,但是在现场水平井施工中电缆受伤、湿接头对接失败、仪器损坏、资料失真等问题仍然层出不穷。2012年长庆油田只气井区块就部署了228口水平井,面对如此巨大的施工任务,有必要重点研究湿接头钻具传输水平井测井施工的关键控制点。按照正确的施工流程施工,着重控制关键点,将大幅提高湿接头钻具传输水平井测井施工的成功率。
Wet joint drilling horizontal well logging construction technology is becoming more mature in the country, in Changqing Oilfield only gas well block every year more Hundreds of construction tasks. Although wet joint drilling is simple in horizontal well logging, the problems of cable damage, wet joint docking failure, instrument damage, data distortion and so on are still emerging in the field of horizontal well construction. In 2012, there are 228 horizontal wells deployed in the gas-only well block of Changqing Oilfield. In the face of such huge construction tasks, it is necessary to focus on the key control points for horizontal well logging with wet-joint boring tools. In accordance with the correct construction process construction, focusing on controlling the key points, will greatly improve the success rate of wet-joint drilling horizontal well logging transmission.