论文部分内容阅读
通过分析华晋沙曲煤矿已完成24207采区采用巷旁充填沿空留巷存在的缺陷和不足,结合相邻24208回采区地质条件及原有掘进的巷道现存状况,对24208回采区提出了锚柱网预支撑袋铸混凝土沿空留巷技术,并进行了支护试验和矿压监测分析。结果表明:应用锚柱网预支撑袋铸混凝土隔墙支护技术,巷旁预支撑构件HT锚柱早期及时切顶卸压能够在留巷过程中有效控制巷道变形,提高沿空留巷围岩稳定性,优化了沿空留巷支护结构、支护参数及施工工艺,确保工作面安全高效回采,可供类似条件沿空留巷支护借鉴。
Based on the analysis of the defects and shortcomings in the 24207 mining area of Huaxin Shaqu Coal Mine that has been completed with the use of roadside filling for gob-side entry retaining and the geological conditions of the adjacent 24208 mining area and the existing existing tunneling conditions, Pillar net pre-support bag cast-in-road technology for gob-side entry retaining, and support tests and mine pressure monitoring and analysis. The results show that the application of prestressed pillars of cast - in - place concrete piles to support the wall of cast - in - place concrete partitioning and early relief of HT anchor column can effectively control the deformation of roadways and improve the stability of surrounding rock during gob - side entry maintenance It optimizes the support structure, supporting parameters and construction technology of gob-side entry retaining to ensure the safe and efficient mining face, which can be used for the gob-side entry retaining with similar conditions.