论文部分内容阅读
安徽某电厂升压站挡土墙建成两年后 ,其中一段墙体产生前倾和墙身开裂现象 ,对电厂的安全造成威胁 ,给调查分析 ,墙体的变形与水有关。针对此问题采取相应措施后 ,使墙体得到了稳定。
Two years after the completion of the retaining wall at the step-up station of a power plant in Anhui Province, a certain section of the wall has an anteversion and wall cracking phenomenon, posing a threat to the safety of the power plant. The investigation and analysis of the wall deformation and the water are relevant. In response to this issue to take appropriate measures to make the wall has been stabilized.