堤防是抵御洪水的主要屏障,虞城县控制流域面积在100km2以上河流有7条,其堤防长度238.8km,其中多数堤防设计标准为5年一遇,10年一遇校核,防洪标准偏低。近些年,国家及地方政府加大水利工程投入,提高河流防御洪水能力,取得了显著成绩。文章从优选施工单位、生产组织、生产技术准备、图纸会审、设计交底、土工试验、施工工艺、协调各方关系等方面,论述了堤防工程施工质量控制的重要环节。
The embankment is the main barrier against floods. In Yucheng County, the control basin covers an area of over 100km2 with 7 rivers and its embankment length is 238.8km. The design standard of most embankments is once every 5 years. Once in 10 years, it is checked and the flood control standard is low . In recent years, the state and local governments have made significant achievements in increasing investment in water conservancy projects and improving the ability of rivers to prevent floods. The article discusses the important links of construction quality control of embankment construction from the aspects of optimizing construction unit, production organization, preparation of production technology, blueprint meeting, design submission, geotechnical test, construction technology and coordination of all parties.