装机容量1260万千瓦的溪洛渡电站工程是“十五”期间开工的最后一项巨型水电工程,也是金沙江梯级电站的第一个开工建设项目,标志着金沙江干流水电梯级开发迈出了实质性步伐。溪洛渡电站的筹备期工程,尤其是其中的主要工程——地下导流洞群的施工,已经促成了多项世界性技术难题
The Xiluodu Power Station project with an installed capacity of 12.6 million kilowatts is the last giant hydropower project started during the “Tenth Five-Year Plan” period, and is also the first construction project of the Jinsha River cascade power station, indicating that the development of the Jinsha River cascade water level has taken a substantial step forward. pace. The preparatory phase of the Xiluodu Power Station, especially the construction of the main underground tunnel diversion tunnel, has already led to a number of worldwide technical problems.