论文部分内容阅读
本文介绍了深圳地铁构架侧梁的特点,分析了构架侧梁焊接变形的情况,讲述了控制构架侧梁焊接变形的措施以及矫正焊接变形的方法。
In this paper, the characteristics of side beam of Shenzhen subway metro frame are introduced, the welding deformation of side beam of frame is analyzed, and the measures of welding deformation of side beam of control frame and the method of correcting welding deformation are introduced.