PCCP管作为近些年来发展起来的一种新型管道材料,得到广泛应用,但理论研究落后于工程实践。当PCCP管正常运行时,后期在管顶可能会有局部超载,并将引起管道的不均匀沉降。本文通过Plaxis 3D Tunnel有限元软件建立三维有限元模型这种情况进行了参数分析,主要考虑了超载大小、土性、管道刚度、接口连接刚度、碎石垫层厚度等参数的变化对管道差异沉降的影响。最后基于得出分析所得出的认识结论,对PCCP管工程实践提出了若干建议。
As a new type of pipe material developed in recent years, PCCP pipe has been widely used, but theoretical research lags behind engineering practice. When the PCCP pipe is in normal operation, there may be partial overloading at the top of the pipe in the late stage and it will cause uneven settlement of the pipe. In this paper, the finite element model Plaxis 3D Tunnel finite element software to establish three-dimensional finite element model of the parameters of the analysis, mainly considering the overload size, soil properties, pipe stiffness, interface stiffness, gravel thickness and other parameters of the pipeline differential settlement Impact. Finally, based on the conclusions drawn from the analysis, some suggestions on PCCP pipe engineering practice are put forward.