天荒坪抽水蓄能电站上库自首次蓄水至今 ,因廊道渗水异常等原因放空检修多次。应用相关统计模型对上库廊道渗水进行计算分析 ,并采用插值原理 ,用差值回归法对上库廊道渗水进
【机 构】
:
天荒坪抽水蓄能有限责任公司 浙江安吉313302
论文部分内容阅读
天荒坪抽水蓄能电站上库自首次蓄水至今 ,因廊道渗水异常等原因放空检修多次。应用相关统计模型对上库廊道渗水进行计算分析 ,并采用插值原理 ,用差值回归法对上库廊道渗水进行分量分离。结果表明 :模型选择正确 ,因子选取合理 ,且计算成果能较真实地反映上库廊道渗水的基本规律
Tianhuangping pumped storage power plant on the reservoir since the first impoundment, due to corridor seepage abnormalities and other reasons venting maintenance many times. Relevant statistical models were used to calculate and analyze the water seepage in the corridor of the upper corridor. The principle of interpolation was used to separate the water seepage in the upper corridor by using the method of difference regression. The results show that the model is selected correctly and the factors are selected reasonably, and the calculation results can more truly reflect the basic law of water seepage in the gallery
其他文献
就宝钢电厂燃气—蒸汽联合循环机组循环效率从机组设计特点和运行中影响机组循环效率等几个方面进行分析。涉及环境温度、高炉煤气温度、高炉煤气热值变化对机组效率的影响,从
通过修改控制系统的几个典型例子,叙述了宝钢电厂燃气轮机联合循环机组,从机组调试到正常投行;从不断完善到深入改造,从而提高机组的控制功能。通过对每个修改案例的起因描述、主
以上海吴泾电厂八期2×600 MW机组扩建工程“飞灰/底渣岛”的应用实例为背景.通过消化、吸收国外飞灰/底渣排放系统的先进技术,剖析该系统核心设计思想,总结设计应用与改进后的成
文章简述了在复杂地形条件下、在隧道施工前和过程中,为了规避施工风险和预防施工过程中可能出现的地质灾害,运用瞬变电磁法勘察含水(泥)的断层、岩溶等水文地质问题;探讨了
简要介绍宝钢电厂 3号锅炉投运以后 ,由燃烧设计煤种变化引起的主蒸汽温度偏低问题。通过一次过热器增加受热面的改造 ,从根本上解决了过热器主蒸汽温度偏低的问题 ,提高了锅
实验选取株行距 1m× 10m的毛白杨和花生间作田 ,研究修枝对间作田不同水平位置的光照及花生产量和生物量的影响。结果表明 :随修枝强度的增大 ,不同处理间作田相应位置的光
介绍宝钢 3期工程电厂 3号机循泵发生的缺陷及其原因分析和解决的方案。
This paper introduces the defects of the machine No.3 circulating pump in Baosteel Phase 3 P
通过对 2 0 0 1年 7月 6日双浦站 1 1 0 k V 1、2号主变失电原因、现场设备、气候环境状况的分析 ,寻找出发生故障的根本原因及存在的问题。以科学、简洁的技术措施进行反措
叙述了在电厂排灰系统广泛应用的渣浆泵过流件的损坏原因 ,提出了避免汽蚀的技术措施 ,对正确、合理使用输送磨蚀性颗粒介质的渣浆泵以及提高过流件的寿命具有一定的指导意义
针对上海吴泾第二发电有限责任公司2×600 Mw机组工程现场调试,概述了沪产首台600MW机组CCS控制方式,重点对其控制功能及运行性能进行了讨论分析。