论文部分内容阅读
简介如何充分利用原主体工程已建成和被破坏的地形进行仁义互通线位设计的过程;尝试平、纵结合设计的新思路;对个别横断面设计作了特殊处理;以及土(石)方工程量计算应注意的问题。
Brief introduction How to make full use of the original main project has been completed and destroyed terrain RenYi interoperability line bit design process; try flat, longitudinal combination of design ideas; made special treatment of individual cross-section design; and earth (stone) side project The amount of calculation should pay attention to the problem.