论文部分内容阅读
水利电力部“水电站压力钢管设计规范”讨论会于3月20日至3月31日在昆明市召开,会议由昆明勘测设计院主持,24个单位,54名代表参加,规划设计院总工程师张振帮,科技委付主任陈益焜出席了会议,並讲了活。主编单位向大会介绍了主要内容和问题,其后分坝内埋管组、岔管组,明管地下埋管组进行了讨论。代表们就规范中的总则、布置,材料、结构分析,水力计算等内容进行了讨论,並提出了一些问题和建议,使其
Ministry of Water Conservancy and Electric Power “Hydropower Station Design Code” Seminar held in March 20 to March 31 in Kunming, the meeting hosted by the Kunming Survey and Design Institute, 24 units, 54 representatives to participate, Planning and Design Institute Chief Engineer Zhang Zhen Bang , Chen Yi 科 director of science and technology committee attended the meeting and talked about live. The chief editor introduced the main contents and issues to the conference, and then discussed the buried pipe group, the fork pipe group and the open pipe underground group in the sub-dam. The delegates discussed the general principles, layout, materials, structural analysis, hydraulic calculation and other contents in the code, and put forward some questions and suggestions