论文部分内容阅读
在珠江流域综合利用规划中。龙滩水电站、大藤峡水利枢纽是西江干流中两座最大的骨干工程,在珠江流域的开发治理中有着举足轻重的地位。今年下半年,这两个工程项目的初步设计、可行性研究已获审查通过。龙滩水电站初步设计审查会议由能源部主
In the Pearl River Basin comprehensive utilization planning. The Longtan Hydropower Station and the Big Tengxia Hydraulic Project are the two largest backbone projects in the main stream of the Xijiang River and play a decisive role in the development and management of the Pearl River Basin. In the second half of this year, the preliminary design and feasibility studies of these two projects have been examined and approved. Longtan Hydropower Station Preliminary Design Review Conference hosted by the Department of Energy