备受关注的苏里格小井眼欠平衡空气钻井试验项目,在钻井40600队承钻的苏38-19井喜获成功。欠平衡空气施工井段于2004年10月29日顺利完工,井深达到了324 m,实施欠平衡空气钻井进尺高达 1126 m。该井打完表层后,于10月21日16点二开,自井深2115 m开始实施欠平衡空气钻井项目试验。为了确保欠平衡空气钻井的顺利实施,负责生产组织的钻井第三项目部领导高度重视,为此,从该队开始安装,就要求设备管理人员盯在现场,严把设备安装质量关,随时解决配套安
The much-anticipated Sulige Swell Hole Balancing Air Drilling pilot project succeeded in drilling the Su 38-19 well drilled by the 40,600-well team. The underbalanced air construction section was successfully completed on October 29, 2004, with a well depth of 324 m and underbalanced air drilling up to 1126 m. After completion of the surface layer of the well, at 21 o’clock on the October 21 to open two, since the depth of 2115 m began to implement under-balanced air drilling project test. In order to ensure the smooth implementation of underbalanced air drilling, the leaders of the third project department responsible for the production organization are paying great attention. Therefore, starting from the installation of the team, the equipment management personnel are required to stare at the scene and strictly control the quality of the equipment installation. Supporting security