经过对花凉亭水库黏土心墙砂壳坝进行地质勘察取样试验和液化分析,由于其上游坝坡砂土密实度不够,在7度地震时,水下部分可能发生液化并产生滑坡,需要进行抗震加固处理。我国目前已进行过抗震加固的土石坝不多,工程经验较少,还没有成熟的加固设计方法和技术规范。本工程应用砂土动强度试验成果,采用动力有限元分析对大坝抗震加固方案进行技术论证,并提出了帮坡压重的抗震加固方案,即在上游坝坡的水下部分抛块石帮坡压重和水上部分填筑石渣料帮坡压重,有效解决了水库蓄水条件下的大坝上游坝坡的抗震加固问题,其经验可供类似工程借鉴。
After the geological survey and liquefaction analysis of the Hua Zhaicing reservoir clay core wall sand dams, due to insufficient compaction of sand and soil in the upstream slope, liquefaction and landslide may occur in the underwater part during the 7-degree earthquake, which requires seismic Reinforcement. At present, there are not many earth-rock dams that have been subjected to seismic strengthening in our country, and have little engineering experience. There is no mature reinforcing design method and technical norms yet. This project applies the dynamic test result of sand and sand, and applies the dynamic finite element analysis to demonstrate the technical scheme of the dam seismic strengthening and proposes a seismic strengthening plan to help the slope to compress the heavy load. That is, Slope pressure and gravel slag filling on the water part of the pressure, the effective solution to the dam reservoir dam under the conditions of aseismic reinforcement, the experience can be used for similar projects.