根据索网结构特点,提出了串联拉索沿导索空中累积滑移安装方法,即将串联的结构索通过吊杆或倒链葫芦挂在导索下,利用牵引索将结构索由下至上沿导索累积牵引就位。该方法充分发挥了导索既导向又承重的作用,构成简单,施工措施费用低。牵引过程中存在包括悬垂拉索、机构大位移和在导索上的滚动滑移。其过程分析,基于非线性动力有限元分析法找形,根据导索单元组总无应力长度(原长)不变的原则,采用调整导索各单元原长的方法来模拟滑轮在导索上的移动,并提出了一致初应变、模型长度倍增、逐单元递推和逐单元递推倍增等4种策略且进行了对比,结果表明逐单元递推倍增策略具有更高分析效率。分别设定导索原长为主索原长、端点直线距离和中间值,通过对比指出了关键施工参数的变化规律,结果表明:导索线形在起始工况是最不利的,导索原长不宜过长且不应超过主索原长;导索和牵引索的索力变化受导索原长影响大,且较为敏感;合理的导索原长应介于主索原长和两端直线距离之间。
According to the characteristics of cable network structure, the method of installing cumulative slip along the guide cable is proposed, that is, the structural cable to be connected in series is hung under the guide cable through the boom or the chain hoist, and the structural cable is guided from bottom to top by the traction cable Cumulative traction in place. The method gives full play to guide the cable both the role of guide and load-bearing, simple structure, low cost of construction measures. During the towing process, there are some problems including the suspension cable, the large displacement of the mechanism and the rolling slippage on the guide cable. According to the principle of non-linear dynamic finite element analysis, according to the principle that the total stress-free length (original length) of the cable unit group is constant, the method of adjusting the original length of each unit of the cable is adopted to simulate the condition that the pulley is on the cable And proposes four kinds of strategies: uniform initial strain, model length doubling, unit-by-unit recursion, and unit-by-unit recursive multiplication. The results show that the unit-by-unit recursive multiplication strategy has a higher analysis efficiency. The original length of the cable was set as the original length of the cable and the straight line distance and middle value of the end cable respectively. The variation of the key construction parameters was pointed out by comparison. The results showed that the linear shape of the cable was the most unfavorable at the initial condition, Length should not be too long and should not exceed the length of the main cable; cable and traction cable changes in cable force by the original length of the cable influence, and more sensitive; reasonable length of the original cable should be between the main cable length and the original Between the straight lines.