论文部分内容阅读
三峡工程左岸 14台机组发电用水获得批准 ,年取水量为 2 32 3亿m3。近日 ,长江水利委员会向中国长江三峡开发总公司正式发放了三峡工程发电取水许可证。三峡工程将从今年 6月开始蓄水 ,此次办理取水许可证 ,取得合法用水权 ,为三峡工程 8月首批机组发电奠定了基础。据介绍 ,取?
The power generation water for the 14 units on the left bank of the Three Gorges Project was approved, with an annual water withdrawal of 232.13 billion m3. Recently, the Yangtze River Water Conservancy Commission to the China Three Gorges Development Corporation formally issued a Three Gorges Project power generation water permit. The Three Gorges Project will begin to impound water from June this year. This time, it has obtained the permit for water abstraction and has obtained the right to legal water use, laying the foundation for the first generation of generating units of the Three Gorges Project in August. According to reports, take?