论文部分内容阅读
介绍了采用套管人工顶进法进行穿越铁路管道工程施工的工艺,并对明挖法与套管人工顶进法进行了分析比较,阐明正确选择施工方法的重要性。
This paper introduces the technology of using casing jacking method to carry through the construction of railway pipelines, analyzes and compares the method of manual jacking with the method of casing excavation, and illustrates the importance of choosing the correct construction method.