论文部分内容阅读
广东省水力资源较丰富,据1979年水力资源普查,全省可开发水力资源738万kW,其中可开发利用小水电资源339万kW.至1985年底止,全省已开发利用小水电装机为151.3万kW,年发电量达43.5亿kW·h,占全省年发电总量169.6亿kW·h的25%,为全省农村用电量的60%,在全省109个市、县中,主要由小水电供电的就有61个县,所以说小水电已成为我省电力建设的一个重要组成部分.
According to the survey of hydraulic resources in 1979, the province can develop 7.38 million kW of water resources, of which 339 million kW can be exploited and utilized by small hydropower resources. By the end of 1985, the province had developed and utilized small hydropower installed capacity of 151.3 Million kW, annual generating capacity of 4.35 billion kW · h, accounting for 25.6% of the total annual generating capacity of 16.96 billion kW · h in the province, 60% of the province’s rural electricity consumption in the province’s 109 cities and counties, There are 61 counties mainly powered by small hydropower, so SHP has become an important part of our province’s electric power construction.