为给全军医院提供符合经济效益的污水处理原则、流程和消毒方法的处理方案,我们在调查研究的基础上进行了医院污水处理模拟试验,指导修建了实验工程并对工程投入正常运转后的净化、消毒效果进行了测定与评价。模拟试验和实验工程在工程结构和处理技术上有两点改进,一是在沉淀池前增加了配水池、三通出水口和污水流量控制阀门,使进入沉淀池的污水不均匀性得到了一定的改善。特别是在沉淀池中增加了勺型上反式出水口和稳流沉降筒,使进入池内的污水在池中的流速显
In order to provide the PLA hospital with cost-effective sewage treatment principles, processes and disinfection methods of treatment programs, we conducted a hospital based on the investigation of sewage treatment simulation test, guide the construction of the experimental project and the project put into normal operation Purification, disinfection effect were measured and evaluated. Simulation experiment and experimental engineering There are two improvements in the engineering structure and treatment technology. One is to add a water distribution tank, a three-way water outlet and a sewage flow control valve in front of the sedimentation tank, so that the nonuniformity of the wastewater entering the sedimentation tank is fixed Improvement. Especially in the sedimentation tank increased scoop-type trans-outlet and steady flow settling barrel, so that the sewage into the pool in the pool flow rate was significantly