1 序言 1934年5月4日,当此研究所被承认其Royal Charter(英国皇家许可证)时第一流的工程师们自始自终能回顾他们的经历以检查供建造基础结构可成龙配套的、有前途的新材料技术的超常发展。用铆接的结构钢已很好被确认,而螺栓和现场焊接连接已发展并正被彻底检验。钢筋混凝土结构正被广泛应用,并且刚在Brittany完成Plougastel桥的Freyssinet研究出预应力体系并正建立制造预制的预应力梁的工厂。主跨1067m的佐治亚华盛顿悬索桥刚顺利竣
1 INTRODUCTION On May 4, 1934, when this Institute was recognized as Royal Charter, first-rate engineers were able to review their experiences from beginning to end to examine the available supporting infrastructure for the construction of Prospects for the extraordinary development of new materials technology. Riveted structural steels have been well identified, and bolting and field welded connections have been developed and are being thoroughly tested. Reinforced concrete structures are in widespread use, and Freyssinet, just completed the Plougastel bridge in Brittany, has developed a prestress system and is building a plant for the manufacture of prefabricated prestressed beams. The 1067m main span of Washington, DC suspension bridge just completed