土石坝地基相互作用研究的现状与展望

来源 :水利水电科技进展 | 被引量 : 0次 | 上传用户:zbrichard
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
对土石坝地基相互作用的研究进展作了简要回顾,并对各种研究理论进行了评述,同时对将混凝土坝地基及土结构相互作用问题的研究手段,直接移植到土石坝地基这种结构和地基都呈强烈非线性的研究的可行性提出质疑.重点对相互作用研究中的人工边界及地震输入机理问题进行了详尽的论述.最后,结合作者承担的课题对土石坝地基相互作用问题的研究进行了展望 This paper briefly reviews the research progress of the earth-rock dam foundation interaction and comments on various research theories. At the same time, the research methods of the interaction between concrete foundation dams and soil structures are directly transplanted to such structures of earth and rock dams as foundation The foundation is strongly non-linearity of the feasibility of the study questioned. Emphasis is placed on the detailed discussion of artificial boundary and earthquake input mechanism in the interaction study. Finally, combining with the subject that the author undertakes, this paper makes a prospect of the research on the interaction of earth-rock dam foundation
其他文献
数值模拟方法是研究河口海岸环境问题的理想工具之一.但由于河口区域的海岸线与河岸线的形状非常复杂,加上众多的岛屿,给模式网格的划分造成很大的困难。为此,将自适应网格的
本研究在重点分析荆江洞庭湖防洪重要水文站监利、城陵矶(七里山)、螺山、武汉关水位流量长系列实测资料的基础上,初步建立了考虑河段水面比降因子模拟水位流量的单一关系模式:即
随着高强度、高频率的世界田径黄金联赛和世界田径锦标赛的举行,作为一名田径比赛运动员,就不得不把一部分时间花在路途飞行上,如著名跨栏运动员刘翔出国参加比赛的机会较多
北京市将成立奥运场馆工程建设监督领导小组,全程监督奥运工程建设。副市长刘敬民介绍,按照市委、市政府领导的要求,市监察局、审计局初步拟定了关于加强对奥运场馆工程建设
通过对我省工业用水节水现状的分析,分行业定量评价了我省各地市工业用水节水水平,采取工业用水弹性系数法,重复利用率提高法和系统动力学法三种方法,预测了我省各地市2000年
本文根据影响瀑布后退的主要因素和实地考察与研究,对以历史资料为据所测算的壶口瀑布后退速度问题提出了一些不同意见和论析。 Based on the main factors affecting the re
本文介绍二滩水电站钢蜗壳与外围钢筋混凝土联合受力三维仿真材料模型试验研究结果,结果表明:大型水电站采用保压浇筑钢蜗壳外围混凝土的方法是可行的,它可以充分发挥钢蜗壳自身
各国研究人员对台阶式斜槽溢洪道水力特性的研究越来越感兴趣。这一方面是由于RCC筑坝技术取得很大的进步,另一方面是因为沿斜槽的消能量大,从而可以减小下游消力池的长度,已通过缩
续上期)4龙滩碾压混凝土坝渗流特性研究41工程概述我国拟建的龙滩高碾压混凝土重力坝是红水河上的龙头水利水电工程,分二期开发,最大坝高分别为192m和2165m,坝顶长度达741m和8365m,装机容量4200MW和5400MW。一
齿式联接器(又称端齿联接器)具有重迭系数大、承载能力高、传动效率高、传动平稳、可靠性高和噪声小等优点。其特点为两平面锥齿相啮合,且有一定的齿根锥角,随着企业引进国外