排除虹吸式电站压力管冰雪堵塞的经验

来源 :水力发电 | 被引量 : 0次 | 上传用户:houqiusheng
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
尼勒克电站是一座由喀什河引水的小水电站,3台机组共500千瓦。电站建在高寒山区,最低气温-40.4℃,从11月分至次年的3月分为冬季运行期,全年负温时间达105天。为利于电站冬季正常运行,设计时采用了虹吸进水方式。从1981年11月建成以来,已经过了3个冬季运行期。在此期间,流冰严重,最大流冰密度达80%,除硬冰外,更多的是冰花雪絮 Nilka Power Station is a small hydropower station that starts with the Kashi River and has a total capacity of 500 kilowatts. The station is built in the alpine mountainous area with the minimum temperature of -40.4 ℃. It is divided into winter operation period from November to March of the next year, and the negative temperature time reaches 105 days throughout the year. In order to facilitate the normal winter operation of power plants, the design uses a siphon water way. Since its completion in November 1981, three winter operations have passed. During this period, severe ice flow, the maximum ice flow density of 80%, in addition to hard ice, more snow ice
其他文献
教育是经济振兴的基础,教育必须为经济建设服务。因此,教育必须与经济紧密结合,才能更有成效地落实科教兴国的战略。特别是市场经济条件下企业的职工教育,直接为本企业培养
巴尔扎克做广告,一直鲜为人知。布依松是一个很好的裁缝,酷爱文学。他十分崇拜巴尔扎克,并经常为巴尔扎克免费做了许多漂亮而得体的服装。然而,他的店铺生意并不景气,生活十
《 A treize ans que je sortis du collège,j’avais achevé mon cours,et à la vérité sans aucun fruit que je puisse à présent mettre en compte. 》 “A trei
NEPCON’96深圳展览会将于9月10日至13日在深圳经济特区举行。这是NEPCON系列展览会在 NEPCON’96 Shenzhen Exhibition will be held from September 10 to 13 in Shenzhe
闸门结构图8示出导流闸门概貌,闸门设计成柔性结构,关闭时,荷载传递到轮子,弹性垫座可被压缩,使每一节轮子都可调正到与埋件紧贴的位置,使边纵梁受力均匀。闸门制造成10节,
贵州省从河流水系看,分属长江和珠江两大流域。贵州省三分之一的土地面积属珠江,珠江有13.3%的土地面积在贵州省境内,贵州与珠江紧密相联。我仅就 Guizhou Province, from t
为扶植个体户搞科研,十二月三日河北省科委和河北省机电工业厅,联合破格为个体联合体“沦州浮阳产销实业公司”研制的,具有创新结构的“PF25B5—15”型漂浮式扬水泵,组织召
进入新时期以来,随着我国社会不断的发展,国际地位不断提高,互联网在我国快速普及,我国开始进入中西文化碰撞的关键时期。相比上世纪末,我国对英语人才的需要更为强烈,英语已
引言台湾是中国的一个省,横跨北回归线,距中国大陆约150公里。岛的轮廓呈烟叶状,长约394公里,宽约144公里,面积约36 000平方公里或式13900平方英里。1.地形该岛地形起伏。中
一、概述白山松花江大桥位于白山水电站下游900米处,总长241米,由两跨跨径80米的双曲拱桥和一跨跨径23米的梁式桥组成于1976年末建成。该桥中墩是江中唯一的桥墩。墩高约29