论文部分内容阅读
简要叙述了在地浸采铀矿山生产各阶段中地球物理综合测井的任务、仪器和方法的现状;并对根据地浸采铀矿山生产工艺的要求,利用国产仪器的主机及应用软件开发的电流测井、定量γ测井2项功能及其应用效果进行了介绍;提出了有关在仪器和方法上需要开发的新测井功能和应投入的各项测井方法。
Briefly described the status quo of geophysical comprehensive logging tasks, instruments and methods in various stages of production of ground-immersed uranium mines. According to the requirements of the production technology of ground-penetrated uranium mines, the current developed by host and application software of domestic instruments Logging, quantitative γ logging two functions and their application effects were introduced; on the instrument and method needs to be developed on the new logging functions and logging methods should be put into.