水拦关水库为我县老愚公梯级水电站的调蓄水库。控制流域面积46.4平方公里,总库容2,640万立方米。对以下三个梯级引水式电站的发电流量起着调节作用,四级电站总装机8,320瓩。水拦关大坝全长183米,其中溢流段长18.5米。非溢流坝及溢流坝最大坝高分别为47.5米及39.3米。大坝采用圬工重力填料坝(图1)。本坝按三级建筑物标准设计(即五十年一遇洪水设计,五百年一遇洪水校核)。 ShuiGuanGuan reservoir for my county old YuGong cascade hydropower storage reservoir. The control basin covers an area of ​​46.4 square kilometers and has a total storage capacity of 26.4 million cubic meters. The following three cascade diversion plant power generation regulation plays a regulatory role, the total installed capacity of four power plants 8,320 瓩. The dam of water barrage is 183 meters in length, of which the overflow section is 18.5 meters long. The maximum dam height for non-spillway and spillway dam is 47.5 meters and 39.3 meters respectively. The dam uses a paddy gravity dam (Figure 1). The dam is designed according to the standard of three buildings (that is, the flood design in 50 years and the flood check in 500 years).
其他文献
1,6-二磷酸果糖(FDP)临床上用于心肌炎、心功能不全的治疗,而它的脑保护作用尚未得到共识,1998年4月以来我们将其用于重症病毒性脑炎,疗效满意,现报告如下。临床资料一、一般资料:治疗组42例,其中男
为探讨小儿心内膜弹力纤维增生症(EFE)临床恢复标准,对15例EFE临床恢复或好转的心电图及胸片结果与超声心动图检测的左心功能进行比较,以10例健康儿作为对照组。结果显示:LVD
研究肝素酶 (来源于 Flavobacterum heparinase,EC4 .2 .2 .7)对人工合成的且含有与抗凝血酶 特定结合位点的肝素五糖 (SHP)的酶解作用 ,并对酶解作用的动力学进行研究。利
研究用分形描述油藏的非均质性,并与渗流力学相结合,建立了非均质油藏的基本产能方程。导出了不同形态的油相相对渗透率曲线下水驱分形非均质油藏产量变化规律的方程式,并结合分
在实现党的十二大提出的到本世纪末使全国工农业年总产值翻两番的战略目标的过程中,物资部门在促进生产、引导生产、保障供应、繁荣经济方面,肩负着光荣而繁重的任务。我们
上海市机电设备供应公司电工供应站,在布电线柜台上,试用电子计算机进行科学管理,及时掌握柜台各种经济活动的信息,分析库存结构,进行销售预测,搞好产需衔接,取得很好效果。
一、概述该门型系由湖南省交通设计院经多年刻苦钻研,精心设计而创制出来的。其最大的特点是:不需要任何启闭机械设备和人力、电力,只是利用水力就能使闸门沿水平方向自动开
一九七三年我们曾进行了异步电机同步化的试验。试验表明:同步化能够有效地补偿无功功率,提高功率因数。但由于励磁环节采用了三相桥式硅元件整流,当电网电压向下波动时,转
江苏省大丰县在拱桥建设实践中,抓住了桥台砌筑体积大这个主要矛盾,从创造新的桥台型式入手,同时相应改革桥身使之轻型化,从而大幅度降低了农桥圬工数量,使原来建一座桥的经
本文介绍了一种新的AVO方法,该方法允许解释员处理实际数据(这归因于拟3-D可视化模块),避免了单独根据地震处理技术带来的种种限制。研究区(图1)位于西班牙西南部陆上Guadal