论文部分内容阅读
从实际工程案例出发,对“锚索+排桩”支护方案进行了选择,并给出了实际工程的设计与分析。
Proceeding from the actual project case, the selection of “anchor cable + row pile” support plan was made and the design and analysis of the actual project was given.