一、项目现场管理情况中国石油集团东北炼化工程有限公司(简称“炼化工程公司”)主业为化工石油工程施工总承包,项目现场管理面临较大挑战,主要体现在以下方面:项目风险控制困难,化工装置施工安全风险大、安全设施要求高;随着建设规模迅速扩大,很难满足化工石油行业对作业人员技能和素质的较高要求;实践中由于大部分新建装置要求产品快速投入市场,致使“三边(边勘察、边设计、边施工)”工程控制难度大;多
I. Project Site Management The main business of CNPC Northeast Engineering & Petrochemical Engineering Co., Ltd. (“CNPC”) is a general contractor for the construction of chemical petroleum projects. The project site management faces great challenges mainly in the following aspects: Project risk control is difficult, chemical equipment construction safety risk is high, safety equipment requirements are high; with the rapid expansion of construction scale, it is difficult to meet the chemical workers in the oil industry on the skills and quality of the higher requirements; in practice, because most of the new plant requires the product Quickly put into the market, resulting in “three sides (while surveying, while designing, while construction) ” engineering control difficult; more