浅述施工工期、质量、安全的控制措施

来源 :价值工程 | 被引量 : 0次 | 上传用户:monowing
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
建设项目合理控制施工进度是指编制施工总进度计划,并在施工过程中控制其执行,按照合同签订的期限完成整个施工项目的任务。但在实际的项目施工现场,由于诸多因素的影响,往往会出现无法在规定时间内完工的现象,或者存在规定时间内完工但质量、安全存在隐患的问题。基于此,本文浅述施工工期、质量、安全的控制措施,以期加强施工项目质量控制。 The construction project’s reasonable control of the progress of construction refers to the preparation of the total construction schedule and the control of its implementation during the construction and the completion of the entire construction project according to the deadline of the contract. However, at the actual construction site of a project, due to the influence of many factors, there are often problems that can not be completed within the stipulated time or there are problems of quality and safety hidden within the prescribed time. Based on this, this article describes the construction period, quality, safety control measures, with a view to strengthening the construction project quality control.
其他文献
一人公司作为一项新的规定,在设立之初就引发了很多争议和思考。一人公司具有明显的优势和弊病,怎样减少一人公司制度所带来的弊病以发挥它的价值呢?本文阐述了对一人公司的看法
《骷髅之舞》与《圣诞夜惊魂》同出于迪斯尼,同样风格另类,都带有明显的个人主义色彩,均大量使用黑色喜剧元素,展现了一个非传统的别样鬼世界。二者的问世虽然时隔62年之久,但有着