黄河中下游冲积平原地带多为砂土、细砂、粉砂地质,且地下水量丰富.该区域深基坑开挖及基础施工期间的降水,无疑是影响工程进度的决定性因素.特别是在雨季、灌溉期间等丰水季节,水位较高、透水系数较大的深基坑降水更是增加了难度.华电渠东热电一期工程翻车机室开挖总深17.5m,通过对比、试验各种降水方案,山东电建二公司最终选取“管井+轻型井点”组合降水方案,满足了基坑开挖及基础施工需要.同时与当地政府协调,将部分抽水直接用于农田灌溉,取得了良好的经济效益和社会效益.
The middle and lower reaches of the Yellow River alluvial plain mostly sand, fine sand, silt geology, and rich groundwater.The excavation of the deep foundation pit in the region and the foundation during the construction of precipitation, is undoubtedly the decisive factor affecting the progress of the project.Especially in the rainy season , During the wet season such as irrigation period, it is more difficult to dewater the deep foundation pit with higher water level and larger water permeability.Due to the total depth of excavation of 17.5m in the dumper compartment of Huadian Dian Dong Thermal Power Project, Precipitation program, Shandong Electric Power Construction Company II finally selected “well + light well point ” combination of precipitation programs to meet the foundation excavation and foundation construction needs.At the same time coordination with the local government, part of the pumping water directly for irrigation, obtained A good economic and social benefits.